Find the full list of construction planned for 2026 at this link. 

Change is happening. Bear with us!
Street and sewer improvements can lead to inevitable slowdowns and traffic reroutes. We ask that you keep your eye on the prize: a city with enhanced livability that can support existing business infrastructure as well as attract new companies. It’s a short-term hassle with long-term payoffs.

As always, safety is our number one priority. Staying calm and following construction zone signage will help us achieve that.

As we work to modernize the sewer and street infrastructure to support growth and a vibrant future for our community, remember: there are better roads ahead, Davenport!

Picture of sign with words Road Work Ahead

Current Traffic Updates

This Just In

  • Road reconstruction on Rockingham Road between Farragut Street and Elmwood Avenue will begin on April 6. This project is one of two reconstruction efforts scheduled along Rockingham Road this year in support of a permanent flood detour for river levels that affect W. River Drive.  The reconstruction will require closure of Rockingham Road between Farragut Street and Elmwood Avenue. Please follow the posted detour or use an alternate route. Work is expected to be completed by early to mid-July, pending weather and subsurface conditions. Travel note: The closure of Rockingham Road between Clark Street and Farragut Street is estimated to reopen on April 8. That closure was in place for emergency water main repairs. Use this link for more details and to view the detour route.
  • Changes to the 4th Street and Fillmore Intersection Detour: To help support travel on 4th Street, we have opened one lane of travel for passenger vehicles only through the intersection. This may be temporary, pending adjacent work. IMPORTANT NOTE: Semis and other large vehicles and equipment need to use the detour at Marquette Street to River Drive to Division Street. Use this link to view the updated detour route. 
  • A new project on Pine Street, between 49th and 53rd Streets, will start on April 6. Travel will initially be reduced to one northbound lane and will later switch to one southbound lane as construction progresses. The reconstruction and ADA sidewalk ramp improvements should be finished by early to mid-July. Use this link to view the detour route. 
  • Locust Street will be closed between Brady Street and Pershing Avenue for a private lead water service line replacement beginning Tuesday, April 7, through April 27. 
  • Iowa American has various water main, hydrant work, and temporary winter patch replacements happening across the city including E 50th Ct, and 3800 block of Wilkes Ave.
Neighborhood Streets
  • Reconstruction of Jebens between 61st and 62nd Streets will begin on April 6. Work is estimated to be completed around mid-to-late June, pending weather. 
  • Beginning April 6, 15th Street between Brady and Harrison Streets, will be closed for milling and asphalt overlay. The project will include ADA ramp upgrades. Work is estimated to be completed by early to mid-June. 
  • East 39th Street will be closed between Eastern and Mississippi Avenues beginning April 6, through May 15, for street reconstruction. 

Major Projects

Closures for Special Events

All Other Street Closures & Lane Reductions (List)

Image of Alert Iowa Banner

Sign-up for Alerts and Report a Pothole

Sign-up for Notices

  • Text betterroads to 672-83 to receive notices about changes in significant construction projects.
  • Sign-up for text, e-mail and/or phone notifications about significant construction projects and other news and notices such as our weekly edition of This Week's Commute, Snow Emergency Declarations, Flood Updates and more. 

Report a Pothole by:

  • Submitting your request on-line our using the SeeClickFix app (download from Google Play or the App Store), or
  • Calling us at 563.326.7923, 7 AM to 4:30 PM, Monday through Friday (except holidays)


Picture of slide and walking path in park

Park Access Impacted by Construction

  • 01.09.26 | The Iowa DOT finished work on the Harrison Street Bridge over Duck Creek last week. While bridge work is complete, the Duck Recreational Trail will remain detoured until the spring, when the trail can be restored. Cyclists, runners, and pedestrians using the trail should cross Harrison Street at 35th Street while the detour is in place. 


Image of construction worker with BRAD acronym

BRAD | Better Roads Ahead Davenport

Meet BRAD. He is all about Better Roads Ahead for Davenport, and helping to reduce frustration when building better roads disrupts travel routes.  Find out when BRAD’s work might impact a major road near you by texting BetterRoads to 69310 or using this website, www.betterroadsdavenport.com, for more details and other resources.

Picture of a white truck

For Contractors

Contractors, or their designee, must submit an application to close a road or reduce travel lanes in the right-of-way at least three business days in advance of the closure unless emergency conditions exist.  Work cannot commence until the application is approved. 

Submit an application at this link.



image of female professional with GIA acronym

GIA | Great Infrastructure Ahead

Meet GIA.  She is all about planning for the future of our community. While BRAD will help keep you informed of current construction, GIA is navigating codes, design and budgets. Look for GIA and Great Infrastructure Ahead announcements as City Council approves budgets and designs for projects coming down the pipe.

Contact

Davenport Public Works
1200 E 46th St, Davenport, IA
Davenport, IA 52807
Phone:
563.326.7923
Email: